Metrology.NET®

TestProcess.Source.Voltage.AC.Sinewave.2Phase

The process of sourcing 2 sinusoidal AC Voltage signals from a device with and measuring the value on the UUT.

This test process can be used by any device that measures absolute AC Voltage on 2 separate legs.

Required Parameters

  • Volts – RMS
  • Frequency – Hz

Optional Parameters

  • Phase –
  • Impedance –
  • UUT.Input – Input Name of the UUT Connecting Point

Output Value & Uncertainty

  • Volts – RMS