Metrology.NET®

TestProcess.Source.Current.AC.Sinewave.3Phase

The process of sourcing a 3 Sinusoidal Alternating Current signals on 3 legs.  

Knowing the shape of the waveform allows the system to make conversions from RMS to PeakToPeak.

Required Parameters

  • Amps – A
  • Frequency – Hz

Optional Parameters

  • Phase –
  • UUT.Input – Input Name of the UUT Connecting Point

Measured Value & Uncertainty

  • Amps