Metrology.NET®

TestProcess.Source.Voltage.Shorted

This process connects a Short to the input of a measurement device and measures the no signal applied Voltage.  This is

The test process is typically used to measure the UUT’s Zero Volts DC  floor values.

Required Parameters

Optional Parameters

  • UUT.Input – Input Name of the UUT Connecting Point
  • Impedance – Input Impedance of the UUT.

Measured Value & Uncertainty

  • All measurements come directly from the UUT.

Leave a Reply